Open on the date the board was told, and know a year ahead if you will not. CPM Pros builds and keeps Primavera P6 schedules for rail and transit work: baselines and monthly updates built to the transit agency's specification for the contractors who owe them, and independent schedule review for the agencies and owner's representatives who have to answer for the date. Float reported by funding milestone, integration testing modeled at its real density, outages and permits shown as the risks they are. Fully remote, anywhere in the US. Written quote with a firm price and delivery date, typically within 3 business days.
Contractors send the schedule specification, contract milestones and drawings. Agencies and owner's representatives send the contractor's XER and narrative, or the program schedule and the last two monthly reports. You get a written quote with a firm price and delivery date, typically within 3 business days. No Primavera P6 license and no scheduler to hire.
Rail and Transit Work We Schedule
Light Rail ExtensionsHeavy Rail and Commuter RailStations and PlatformsBored and Cut-and-Cover TunnelsElevated Guideway and BridgesTrack, Traction Power and SystemsMaintenance Facilities and YardsBus Rapid TransitStation Area and Utility RelocationCase studies and articles on rail and transit schedules, written for agency program staff, owner's representatives and the contractors who build the work. The PDFs are free to download; more reference papers are in the Technical Library.
Two kinds of client. General contractors and trade contractors who have won transit work and owe the agency a cost- and resource-loaded Primavera P6 baseline, monthly updates and time impact analyses. And transit agencies, program managers and owner's representatives who want an independent read of a contractor's schedule or of their own program schedule before a board or funding partner sees it. We do not work both sides of the same contract.
Most transit agency specifications ask for a cost- and resource-loaded P6 schedule with the agency's activity coding, a narrative with every update, and a time impact analysis for every change or delay. Many also require the native P6 file (the XER), interface milestones with other contracts, track access or outage windows as scheduled activities, and systems integration testing and start-up shown in detail rather than as one bar. The baseline is built to the section the agency's reviewer will check it against and revised until the agency accepts it.
A scheduler who does not work for the contractor or the program office reads the schedule as a schedule: logic, float, calendars, the paths to each funding and revenue service milestone, how integration testing and outages are modeled, and whether the monthly report says what the schedule says. The agency gets a written finding it can act on months before a date moves. It complements an in-house controls team; it does not replace it.
Yes. Full Funding Grant Agreement conditions, appropriation dates and local funding commitments are set up as milestones in the schedule, and each monthly review reports the float remaining on the path to each one. A path that loses float month after month is reported while re-sequencing or bridge funding is still a cheap decision.
As activities with durations, owners and the conditions that could reopen them, not as single milestones with fixed dates. A lost weekend outage is shown with the next available window, so the schedule prices what a missed window costs. Utility relocations carry the utility's own commitment dates. Environmental review, historic consultation and permit windows are shown as processes, with the work they release tied behind them.
For a contractor: the schedule specification, the contract milestones and the drawings, plus the agency's activity coding if it has one. For an agency or owner's representative: the contractor's current XER and narrative, or the program schedule and the last two monthly reports. You get a written quote with a firm price and delivery date, typically within 3 business days. The work is delivered remotely anywhere in the US.
Written quote with a firm price and delivery date, typically within 3 business days. Talk to the scheduler, not a salesperson.
Whether you need a baseline developed, a delay analyzed, or an independent schedule review, we’re ready to engage. Scheduling is the only thing on our calendar.